Services · New & add-on construction

From bare dirt to a striped lot.

Site demolition, grading, utilities, concrete, base rock, paving, striping and signs for new and add-on construction.

Bottom up

How a new lot gets built

Nine steps, in the order we do them. Scroll, and the cross-section builds itself.

  1. 1

    Site demolition

    Old pavement, concrete and whatever else is in the way, broken out and hauled off.

  2. 2

    Excavation & grading

    The site cut and filled to grade, so water runs where it should.

  3. 3

    Soil stabilization

    Weak native soil treated so it can carry the pavement and the traffic on it.

  4. 4

    Underground utilities

    Storm drains and underground lines laid before the pavement goes down.

  5. 5

    Curbs, gutters & sidewalks

    Concrete curb, gutter and walks that frame the lot and carry the water away.

  6. 6

    Aggregate base rock

    Compacted base rock, the layer that makes the asphalt on top last.

  7. 7

    Paving & seal coat

    Hot asphalt laid, rolled and sealed.

  8. 8

    Striping

    Stalls, arrows, crosswalks, fire lanes and accessible parking, laid out and painted.

  9. 9

    Signage & bumpers

    Signs and wheel stops: the last things in before the lot opens.

Scope, schedule and budget.

We understand that these are the key elements that make or break every project. Sierra Asphalt is very proud of our record of completing projects on time and on budget.

The lessons we have learned since 1977 save our clients time and money.

On new and add-on construction

Grading crew and white work trucks on a freshly graded dirt road
Grading a new road
Loader and grader moving dirt on a new site next to houses
Excavation and grading
New curb, gutter and base rock along a widened road, cones on the lane line
Curb, gutter and base
Crew member setting curved curb forms on base rock, skid steer behind
Curb forms on base rock
Yellow paver and crew paving a new lot
Paving a new lot

Building something new?

Send us the plans or the address. A project consultant will call you within one business day.